Soma Care and Maintenance

Periodically, we do maintenance on Soma. On Sunday and Monday, we had a solid crew down on Pier 14 to replace some blubs, remove graffiti, and reinforce the mesh on the lower dodecas.

Adriaan and Siobhan remove a stripped out wood screw from the decking.

Adriaan and Siobhan remove a stripped out wood screw from the decking.

Amanda installs a light-diffusing "knee blub" to the lower dodeca's dendrite.

Amanda installs a light-diffusing “knee blub” to the lower dodeca’s dendrite.

Praise for SOMA as a Good Spot to Hang Out

Broke-Ass Stuart tips his hat to our sculpture Soma, whose surrounding cement benches, cedar decking, and gorgeous night-lights backdrop make it an ideal place to chill in the great urban outdoors.

nan palmero soma

photo by Nan Palmero

Time-lapse of the Soma build

How to install a sculpture in about 90 seconds:

Big thanks to Karen Agresti, Greg Armstrong, Hayden and crew for their work filming this!