Soma Care and Maintenance

Periodically, we do maintenance on Soma. On Sunday and Monday, we had a solid crew down on Pier 14 to replace some blubs, remove graffiti, and reinforce the mesh on the lower dodecas.

Adriaan and Siobhan remove a stripped out wood screw from the decking.

Adriaan and Siobhan remove a stripped out wood screw from the decking.

Amanda installs a light-diffusing "knee blub" to the lower dodeca's dendrite.

Amanda installs a light-diffusing “knee blub” to the lower dodeca’s dendrite.

Leave a comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: